| Client: |
University of Toronto |
| General Contractor: |
Eastern Construction Company |
| Architect: |
Shore Tilbe Irwin and Partners (STIP) |
| Engineer: |
Crossey Engineering Limited |
| Location: |
Mississauga, Ontario |
| Total Construction Value: |
$70 million
|
| Square Feet: |
140,000 sq. ft.
|
| Start Date: |
October 2009
|
| Completion Date: |
March 2011
|
| Contract Type: |
Design Build |
| |
|
DESCRIPTION:
The new University of Toronto Instruction Centre will include a 500 seat auditorium and a 300 seat auditorium. As well as; seminar rooms, computer labs, food service space, and a technology resource centre. The basement will house the mechanical room, and also a penthouse mechanical room. There will be in-floor heating system in the perimeter as well as in the atrium on each level. There will also be a Geothermal Heating/Cooling Loop.
This is a design build, LEED® Silver project.